<?xml version='1.0' encoding='utf-8'?>
<feed xmlns="http://www.w3.org/2005/Atom"><title>Stack Ledger</title><id>https://reedos.dev/stack_ledger/</id><link href="https://reedos.dev/stack_ledger/feed.xml" rel="self" /><link href="https://reedos.dev/stack_ledger/" /><updated>2026-09-27T13:29:43Z</updated><author><name>Stack Ledger</name></author><entry><id>https://reedos.dev/stack_ledger/ledger/#industry-bls-aug-2026</id><title>August payroll data show an uneven industrial employment picture</title><link href="https://www.bls.gov/news.release/archives/empsit_09042026.htm" /><updated>2026-09-06T12:00:00Z</updated><published>2026-09-04T12:00:00Z</published><summary>BLS reports a preliminary, seasonally adjusted gain of 16,000 U.S. manufacturing jobs and a decline of 23,000 information-sector jobs in August 2026. These broad sectors include activity beyond AI, so the changes cannot be attributed to AI alone.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#workforce-bls-aug-2026</id><title>What the August jobs report establishes</title><link href="https://www.bls.gov/news.release/archives/empsit_09042026.htm" /><updated>2026-09-06T12:00:00Z</updated><published>2026-09-04T12:00:00Z</published><summary>BLS reports gains of 22,000 construction jobs and 8,000 nonresidential specialty trade jobs, a subset of construction. BLS calls overall construction little changed. These broad industry figures do not isolate electricians or AI projects.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#workforce-wh-aug-jobs-2026</id><title>Reading the White House article</title><link href="https://www.whitehouse.gov/releases/2026/09/made-in-america-manufacturing-private-hiring-power-explosive-august-jobs-report/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-09-04T12:00:00Z</published><summary>The administration presents the August report as evidence for its reindustrialization agenda. The ledger uses the underlying BLS release for measured payroll changes; those figures alone do not establish policy or AI causation.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#coverage-stargate-sites</id><title>Stargate is tracked campus by campus</title><link href="https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene" /><updated>2026-09-06T12:00:00Z</updated><published>2026-09-03T12:00:00Z</published><summary>Epoch’s Abilene record distinguishes an estimated current IT footprint from its end-state projection. Stack Ledger now separates additional New Mexico, Wisconsin, Michigan, Ohio and Texas sites, preserving different construction and operating evidence instead of assigning the program envelope to every campus.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#coverage-hynix</id><title>Indiana HBM packaging gets a revised production schedule</title><link href="https://news.skhynix.com/en/groundbreaking-ceremony-in-indiana/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-08-28T12:00:00Z</published><summary>SK hynix reports groundbreaking for its Indiana packaging and test facility. The updated release distinguishes cleanroom readiness from later mass production, moving beyond the older overview’s earlier operations target. Korean wafer fabrication and U.S. packaging remain separate production steps.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#workforce-bls-electricians-2026</id><title>The electrician outlook includes AI and the grid</title><link href="https://www.bls.gov/ooh/construction-and-extraction/electricians.htm" /><updated>2026-09-06T12:00:00Z</updated><published>2026-08-27T12:00:00Z</published><summary>BLS projects electrician employment to grow 9% over 2025–2035 and cites data centers, grid upgrades and renewable power connections among the drivers. Projected annual openings include replacement needs.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-cape-phases</id><title>Cape Station advances commissioning with a phased power schedule</title><link href="https://fervoenergy.gcs-web.com/news-releases/news-release-details/fervo-energy-reports-second-quarter-2026-results" /><updated>2026-09-06T12:00:00Z</updated><published>2026-08-12T12:00:00Z</published><summary>Fervo reports mechanical completion on its first two GeoBlocks. Block 1 targets first power in Q4 2026, with blocks 2 and 3 following in early 2027; Phase II targets 2028. Commissioning progress should not be recorded as the entire first phase already generating.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-generation-growth</id><title>Actual electricity output is growing alongside capacity plans</title><link href="https://www.eia.gov/outlooks/steo/archives/aug26.pdf" /><updated>2026-09-06T12:00:00Z</updated><published>2026-08-11T12:00:00Z</published><summary>EIA estimates U.S. electric power sector generation rose by 37 billion kWh, or 1.8%, in the first half of 2026 versus the same period in 2025. Solar and wind generation increased 21% and 6%. These are historical output changes, not nameplate additions or electricity dedicated to AI.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#coverage-terafab</id><title>Terafab enters the delivery ledger as a commitment</title><link href="https://new.spacex.com/updates" /><updated>2026-09-06T12:00:00Z</updated><published>2026-08-06T12:00:00Z</published><summary>SpaceX identifies a Texas site and an initial investment requirement for Terafab. The ledger separates this future chip-manufacturing program from Tesla Cortex training compute and the Colossus data centers. Permits, first wafers and qualified production remain milestones to verify.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-ercot-review</id><title>Texas grid-connection review changes the scheduling context</title><link href="https://www.ercot.com/services/comm/mkt_notices/M-A080326-01" /><updated>2026-09-06T12:00:00Z</updated><published>2026-08-03T12:00:00Z</published><summary>ERCOT says data-center large loads must undergo verification before advancing through interconnection, and delays its planned Batch Zero classification notices. The notice does not establish that Abilene’s operating facilities have stopped or identify the effect on each expansion.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#coverage-colossus-power</id><title>Colossus power transition has a dated removal schedule</title><link href="https://x.ai/memphis/updates" /><updated>2026-09-06T12:00:00Z</updated><published>2026-07-30T12:00:00Z</published><summary>SpaceXAI reports a permanent Southaven power plant under construction and an agreed schedule for removing temporary turbines. Grid energization, temporary generation, the permitted future plant and the filed legal challenge are tracked separately. Actual removals and operating output require follow-up evidence.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#coverage-tesla-stages</id><title>Tesla driving and robotics retain their deployment stages</title><link href="https://assets-ir.tesla.com/tesla-contents/IR/TSLA-Q2-2026-Update.pdf" /><updated>2026-09-06T12:00:00Z</updated><published>2026-07-22T12:00:00Z</published><summary>Tesla’s shareholder update distinguishes consumer FSD supervision from city-specific Robotaxi operations. Optimus training builds and manufacturing preparations do not establish a productive deployed fleet. Cortex compute is tracked separately from driving exposure and physical work.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-packaging</id><title>TSMC and Amkor extend the Arizona packaging supply chain</title><link href="https://ir.amkor.com/news-releases/news-release-details/tsmc-and-amkor-technology-announce-long-term-partnership" /><updated>2026-09-06T12:00:00Z</updated><published>2026-07-16T12:00:00Z</published><summary>The companies describe a long-term U.S. advanced-packaging partnership while Amkor’s Arizona campus and TSMC’s fabrication facilities continue development. An agreement and an expanding site do not establish commissioned packaging throughput.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-hyperion</id><title>Hyperion’s expanded campus remains a construction-stage plan</title><link href="https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-07-13T12:00:00Z</published><summary>Meta describes a 5 GW campus expansion and future Entergy-backed energy infrastructure. The project tracker keeps the announced rating separate from verified operational capacity and asks for generation, grid and data-center commissioning evidence.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#coverage-hyperion</id><title>Hyperion separates local contracts from investment plans</title><link href="https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-07-13T12:00:00Z</published><summary>Meta’s Richland Parish update distinguishes contracts awarded to Louisiana businesses from its regional investment plans and future staffing. The jobs table keeps expected peak construction work apart from promised permanent roles; contracts awarded are not labeled as cash already paid.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-grid-queues</id><title>Grid agreements are improving, but the queue is not delivered power</title><link href="https://emp.lbl.gov/news/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-amidst" /><updated>2026-09-06T12:00:00Z</updated><published>2026-07-01T12:00:00Z</published><summary>Berkeley Lab reports 2,061 GW of generation and storage active in end-2025 queues. Several regions processed record agreement volumes, while the median path to commercial operation exceeded five years in the available regional data. Queue withdrawals also contributed to the smaller backlog.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#industry-semi-memory-2026</id><title>Memory capacity outlook points to further expansion</title><link href="https://www.semi.org/en/semi-press-release/semi-projects-300mm-memory-equipment-investment-to-surpass-50-billion-dollars-in-2026" /><updated>2026-09-06T12:00:00Z</updated><published>2026-06-29T12:00:00Z</published><summary>SEMI projects global 300mm memory fabrication capacity of 4.1 million wafers per month in 2026 and 4.2 million in 2027. These are forecasts covering memory broadly, not HBM-only output or accelerator shipments.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-fairwater</id><title>Fairwater moves from construction plans to reported operation</title><link href="https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-06-23T12:00:00Z</published><summary>Microsoft reports its first Mount Pleasant facility fully operational, with nearly 550 full-time employees on site. Construction of the adjacent second facility continues toward a 2028 completion schedule. No commissioned-MW total is supplied in this release.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-chpe</id><title>CHPE adds an operating transmission link to New York City</title><link href="https://chpexpress.com/news/the-champlain-hudson-power-express-marks-completion-of-a-landmark-1250-mw-energy-infrastructure-project-connecting-quebec-to-new-york-city/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-06-16T12:00:00Z</published><summary>The developer reports commercial operation and power deliveries on the 1,250 MW Quebec-to-New York City link. This is transmission capability, not new generating capacity. The June disclosure also identifies temporary market restrictions; later resolution remains a follow-up.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#green-qcells-cells</id><title>Qcells starts U.S. solar cell manufacturing</title><link href="https://us.qcells.com/blog/qcells-begins-solar-cell-manufacturing-at-americas-first-and-only-vertically-integrated-solar-factory-in-cartersville-georgia/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-06-09T12:00:00Z</published><summary>Qcells reported starting Cartersville solar cell production in June 2026, with module assembly at full capacity. Full integrated production remained targeted for Q3, and the combined Georgia workforce figure was an expectation, not verified hiring.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-metr</id><title>Model capability needs a reliability threshold</title><link href="https://metr.org/time-horizons/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-05-08T12:00:00Z</published><summary>METR’s current Time Horizon 1.1 page distinguishes 50% and 80% success on software tasks measured in human-expert time. It warns that measurements above 16 hours are unreliable with its current task suite. These results do not establish dependable autonomy across ordinary jobs.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#coverage-waymo</id><title>Waymo operating service has a measurable footprint</title><link href="https://blog.google/company-news/inside-google/message-ceo/alphabet-earnings-q1-2026/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-04-29T12:00:00Z</published><summary>Alphabet reports fully autonomous rides across an expanded U.S. service footprint. The ledger keeps this disclosure separate from Waymo’s older explicitly paid-trip run-rate, commercial vehicle count and rider-only safety mileage, retaining each record’s geography and date.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#iea-outlook</id><title>A clearer view of the power ahead</title><link href="https://www.iea.org/reports/key-questions-on-energy-and-ai/executive-summary" /><updated>2026-09-06T12:00:00Z</updated><published>2026-04-16T12:00:00Z</published><summary>The IEA’s updated outlook puts global data-center electricity consumption at roughly 950 TWh in 2030, from 485 TWh in 2025. Grid delivery and equipment supply remain important to realizing that growth.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-mlperf</id><title>New inference results broaden the measurement toolkit</title><link href="https://mlcommons.org/2026/04/mlperf-inference-v6-0-results/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-04-01T12:00:00Z</published><summary>MLPerf Inference v6.0 adds a GPT-OSS 120B workload and an interactive DeepSeek-R1 scenario permitting speculative decoding. Compare compatible workloads, quality targets, accelerator counts and serving scenarios. Throughput results do not by themselves measure dollar cost or application reliability.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-inference-cost</id><title>Inference price-performance research extends the cost picture</title><link href="https://arxiv.org/abs/2511.23455v2" /><updated>2026-09-06T12:00:00Z</updated><published>2026-03-23T12:00:00Z</published><summary>A revised research paper estimates roughly 5–10-fold annual declines in the price of achieving a fixed benchmark performance level across several task families. This is a retrospective benchmark-based estimate, not a guarantee that frontier API prices or every real task get cheaper at that rate.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#fabric-coherent-cpo</id><title>Coherent optical engines · demonstration announced</title><link href="https://www.coherent.com/news/press-releases/coherent-co-packaged-optics-cpo-technologies-ofc-2026" /><updated>2026-09-06T12:00:00Z</updated><published>2026-03-17T12:00:00Z</published><summary>Coherent announced OFC demonstrations of several CPO architectures and components. This is a demonstration announcement, not evidence of installed production capacity.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#nuclear-horizon</id><title>A longer horizon for firm power</title><link href="https://www.energy.gov/ne/articles/nations-nuclear-reactor-fleet-rise" /><updated>2026-09-06T12:00:00Z</updated><published>2026-03-12T12:00:00Z</published><summary>DOE describes a 400 GW U.S. nuclear capacity goal for 2050. It is an economy-wide ambition; tracking operational additions will help distinguish the target from delivered power.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#fabric-lightmatter-passage</id><title>Lightmatter Passage · sampling reported</title><link href="https://lightmatter.co/press-release/lightmatter-achieves-record-1-6-tbps-per-fiber-to-accelerate-ai-optical-interconnect/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-03-11T12:00:00Z</published><summary>Lightmatter reported Passage chiplet sampling and a throughput demonstration. Sampling is earlier than volume deployment.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-hbm</id><title>Samsung reports commercial HBM4 shipments</title><link href="https://news.samsung.com/global/samsung-ships-industry-first-commercial-hbm4-with-ultimate-performance-for-ai-computing" /><updated>2026-09-06T12:00:00Z</updated><published>2026-02-12T12:00:00Z</published><summary>Samsung says HBM4 mass production has begun and commercial products have shipped. This establishes a product milestone, not a verified industry-wide output rate; comparable shipment volumes and packaging throughput remain research gaps.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-rainier</id><title>AWS reports deployed accelerator supply and production workloads</title><link href="https://www.aboutamazon.com/news/company-news/amazon-earnings-q4-2025-report" /><updated>2026-09-06T12:00:00Z</updated><published>2026-02-05T12:00:00Z</published><summary>Amazon reports 1.4 million Trainium2 chips landed across its fleet and more than 500,000 in the operational Rainier cluster. Rainier is a subset of the fleet, so these counts must not be added. The same release says Trainium3 is delivering production workloads.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#fabric-marvell-celestial</id><title>Marvell / Celestial AI · acquisition completed</title><link href="https://www.marvell.com/company/newsroom/marvell-completes-acquisition-of-celestial-ai.html" /><updated>2026-09-06T12:00:00Z</updated><published>2026-02-02T12:00:00Z</published><summary>Marvell completed the acquisition of Celestial AI. Its optical scale-up technology now belongs within the Marvell profile; acquisition value is not product revenue.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#workforce-corning-meta</id><title>Fiber supply also creates industrial work</title><link href="https://www.corning.com/worldwide/en/about-us/news-events/news-releases/2026/01/corning-and-meta-announce-multiyear-up-to-6-billion-agreement-to-accelerate-us-data-center-buildout.html" /><updated>2026-09-06T12:00:00Z</updated><published>2026-01-27T12:00:00Z</published><summary>Corning’s Meta agreement is for up to $6 billion over multiple years and supports a North Carolina expansion. Its employment language includes sustaining an existing workforce, not 5,000 newly created jobs.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#industry-micron-ny-2026</id><title>Micron announces New York groundbreaking; production expected in 2030</title><link href="https://investors.micron.com/news/press-release/2026/Micron-Celebrates-Official-Groundbreaking-at-New-York-Megafab-Site-01-16-2026/default.aspx" /><updated>2026-09-06T12:00:00Z</updated><published>2026-01-16T12:00:00Z</published><summary>Micron announced the groundbreaking for its New York memory complex, with up to four fabs planned. The company expects production to start in 2030 and ramp through the decade. Its regional jobs projection is a long-term impact claim, not a count of workers already hired.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#green-firstsolar-la</id><title>Solar manufacturing delivers reported Louisiana employment</title><link href="https://www.nasdaq.com/press-release/first-solar-inaugurates-new-11-billion-ai-enabled-louisiana-manufacturing-facility" /><updated>2026-09-06T12:00:00Z</updated><published>2025-11-21T12:00:00Z</published><summary>First Solar’s inauguration release reports a $1.1 billion Louisiana facility and more than 700 current employees. Manufacturing began in July 2025; the later staffing target and full-ramp module capacity remain distinct from that reported milestone.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#wisconsin</id><title>Another chapter in Wisconsin’s buildout</title><link href="https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/" /><updated>2026-09-06T12:00:00Z</updated><published>2025-09-18T12:00:00Z</published><summary>Microsoft announced an additional $4 billion commitment for a second Wisconsin data center over three years. The pledge is tracked separately from completed construction and actual expenditure.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-alphagenome</id><title>AlphaGenome supplies measured scientific prediction results</title><link href="https://deepmind.google/blog/alphagenome-ai-for-better-understanding-the-genome/" /><updated>2026-09-06T12:00:00Z</updated><published>2025-06-25T12:00:00Z</published><summary>DeepMind reports gains on DNA-sequence and regulatory-variant prediction evaluations; its research page notes Nature publication in January 2026. These are research prediction outcomes, not evidence of new treatments or demonstrated clinical benefit.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#fabric-broadcom-cpo</id><title>Broadcom Bailly CPO · volume production reported</title><link href="https://investors.broadcom.com/news-releases/news-release-details/broadcom-announces-third-generation-co-packaged-optics-cpo" /><updated>2026-09-06T12:00:00Z</updated><published>2025-05-15T12:00:00Z</published><summary>Broadcom described its Tomahawk 5-Bailly CPO generation as in volume production while announcing a newer generation. That does not establish universal CPO adoption.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#workforce-ibew-datacenters</id><title>Training capacity matters</title><link href="https://ibew.org/electrical_worker/the-data-center-surge-a-new-generation-of-ibew-jobs/" /><updated>2026-09-06T12:00:00Z</updated><published>2025-05-01T12:00:00Z</published><summary>IBEW’s May 2025 reporting describes rising data-center labor demand and a nearly tripled apprenticeship program at Baltimore Local 24. This is a dated local union account, not a national hiring statistic.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#grid-eaton-jonesville</id><title>Transformer investment links grid demand to manufacturing jobs</title><link href="https://www.eaton.com/us/en-us/company/news-insights/news-releases/2025/eaton-invests-in-new-south-carolina-transformer-manufacturing.html" /><updated>2026-09-06T12:00:00Z</updated><published>2025-02-12T12:00:00Z</published><summary>Eaton announced a $340 million Jonesville transformer manufacturing investment, with production and hiring for 700 local jobs expected to begin in 2027. The 2025 disclosure remains a plan until delivery evidence is reviewed.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#industry-ge-jobs-2025</id><title>Power equipment expansion includes a U.S. workforce commitment</title><link href="https://www.gevernova.com/news/press-releases/ge-vernova-invest-almost-600-million-us-factories-facilities-over-next-two-years" /><updated>2026-09-06T12:00:00Z</updated><published>2025-01-29T12:00:00Z</published><summary>GE Vernova announced almost $600 million for U.S. factories and facilities over two years, with approximately 1,500 expected factory and engineering jobs. This is a dated investment and hiring plan; realized employment remains a follow-up question.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#delivery-productivity</id><title>Customer-support field evidence goes beyond adoption counts</title><link href="https://arxiv.org/abs/2304.11771v2" /><updated>2026-09-06T12:00:00Z</updated><published>2024-11-06T12:00:00Z</published><summary>The revised Generative AI at Work paper studies 5,172 support agents and reports a 15% average increase in issues resolved per hour, with heterogeneous effects. This is historical evidence from a particular workplace setting, not a 2026 economy-wide productivity estimate.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#tsmc-n2</id><title>An advanced manufacturing milestone</title><link href="https://investor.tsmc.com/static/annualReports/2025/english/index.html" /><updated>2026-09-06T12:00:00Z</updated><summary>TSMC reports that its 2 nm technology entered high-volume manufacturing in the fourth quarter of 2025. Its annual report also describes expanding manufacturing capacity across regions.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#cost-access</id><title>Useful model capability became more affordable</title><link href="https://hai.stanford.edu/ai-index/2025-ai-index-report/research-and-development" /><updated>2026-09-06T12:00:00Z</updated><summary>Stanford’s 2025 AI Index records a drop from $20 to $0.07 per million tokens at a GPT-3.5-equivalent benchmark threshold between November 2022 and October 2024.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#adoption</id><title>AI reaches more organizations</title><link href="https://hai.stanford.edu/ai-index/2026-ai-index-report" /><updated>2026-09-06T12:00:00Z</updated><summary>The 2026 AI Index reports organizational AI adoption of 88%, following 78% in the previous report. These survey results track use; measured business outcomes remain a separate research question.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-1ea1559ce6e643d86baa</id><title>Veo 3 zero-shot video reasoning</title><link href="https://hai.stanford.edu/ai-index/2026-ai-index-report/technical-performance" /><updated>2026-09-07T02:52:53Z</updated><summary>Google DeepMind’s Veo 3 demonstrated zero-shot abilities to simulate physical behaviors like buoyancy and maze solving across more than 18,000 generated videos, indicating emergent video reasoning without task-specific training.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-191cdc963d3034277350</id><title>Lumentum UHP laser accelerated life test</title><link href="https://www.lumentum.com/en/blog/reliability-becomes-new-currency-how-cpo-rewriting-laser-performance" /><updated>2026-09-07T21:48:24Z</updated><published>2026-06-17T12:00:00Z</published><summary>Lumentum reports an accelerated life-test program for its ultra-high-power laser platform used in ELSFP solutions for co-packaged optics. The company states more than 100 million accelerated device hours with zero observed failures and stable operating characteristics, supporting reliability objectives for large-scale AI and CPO deployments.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-70fe9bd09a1938646026</id><title>Richland Parish Data Center · Mortenson scope</title><link href="https://www.mortenson.com/projects/richland-parish-data-center" /><updated>2026-09-07T22:05:26Z</updated><summary>Mortenson lists its scope for the Richland Parish Data Center as site prep and grading, underground utilities, medium-voltage distribution and substations for onsite power, onsite water treatment, offsite wastewater treatment, administration and IBOS buildings and guard houses, and outside plant fiber distribution.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-96a73a25700c591a9b01</id><title>Turner Construction selected for Meta Jeffersonville hyperscale data center</title><link href="https://www.turnerconstruction.com/insights/turner-construction-company-to-build-hyperscale-data-center-for-meta-in-indiana" /><updated>2026-09-08T07:18:33Z</updated><published>2024-01-25T12:00:00Z</published><summary>Turner Construction announced on January 25, 2024 that it was selected to build a hyperscale data center campus for Meta in Jeffersonville, Indiana. The company states the nearly 700,000-square-foot campus will represent an investment of more than $800 million and support approximately 100 jobs once completed.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-a0f76118e940cbe3b5aa</id><title>Isomorphic Labs Series B funding</title><link href="https://www.isomorphiclabs.com/press/isomorphic-labs-funding" /><updated>2026-09-08T17:37:20Z</updated><published>2026-05-12T12:00:00Z</published><summary>Isomorphic Labs announced $2.1 billion Series B funding on 12 May 2026 to scale its AI drug design engine and advance therapeutic programs toward the clinic. The financing is led by Thrive Capital with participation from Alphabet, GV, MGX, Temasek, CapitalG and the UK Sovereign AI Fund.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#correction-f21b782b05987822e4db</id><title>NVIDIA describes NVLink Fusion for custom XPUs</title><link href="https://blogs.nvidia.com/blog/nvlink-fusion-xpu-ai-factory/" /><updated>2026-09-09T03:51:53Z</updated><published>2026-08-24T12:00:00Z</published><summary>NVIDIA describes NVLink Fusion as a way to connect custom XPUs to its AI infrastructure. The company presents performance and time-to-market benefits for semi-custom AI factories; the article does not establish measured deployment gains. Correction: Classifies a company architecture announcement; avoids implying an initial launch or measured deployment gains.</summary><link rel="related" href="https://reedos.dev/stack_ledger/ledger/#note-f21b782b05987822e4db" /></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#correction-bdf88a88599fdadd3400</id><title>Amazon Nova Act SDK research preview</title><link href="https://www.aboutamazon.com/news/innovation-at-amazon/amazon-nova-website-sdk" /><updated>2026-09-09T03:51:53Z</updated><summary>Amazon announced a research preview of the Amazon Nova Act SDK on nova.amazon.com, allowing developers to experiment with an early version of a model trained to perform actions within a web browser. Correction: Classifies research-preview availability as a company announcement rather than a measured research result.</summary><link rel="related" href="https://reedos.dev/stack_ledger/ledger/#note-bdf88a88599fdadd3400" /></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#correction-388bb6fc196f6f62b89d</id><title>Nebius multi-billion dollar Microsoft AI infrastructure agreement</title><link href="https://nebius.com/newsroom/nebius-announces-multi-billion-dollar-agreement-with-microsoft-for-ai-infrastructure" /><updated>2026-09-09T03:51:53Z</updated><published>2025-09-08T12:00:00Z</published><summary>In its September 8, 2025 announcement, Nebius said it would deliver dedicated AI infrastructure capacity to Microsoft from its Vineland, New Jersey data center under a multi-year agreement, with delivery planned to begin later in 2025. This records the agreement, not subsequent commissioning. Correction: Classifies the agreement as a company announcement and limits the summary to the retained evidence; removes the 2026 growth statement.</summary><link rel="related" href="https://reedos.dev/stack_ledger/ledger/#note-388bb6fc196f6f62b89d" /></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#correction-6da38e8f55121f0e70a0</id><title>America’s Workforce Academy first cohort graduates</title><link href="https://about.fb.com/news/2026/08/americas-workforce-academy-meta-skilled-trade-training-program/" /><updated>2026-09-09T03:51:53Z</updated><published>2026-08-18T12:00:00Z</published><summary>In its August 18, 2026 update, Meta reported that the first America’s Workforce Academy cohort had graduated the preceding week. Meta described a free program with credentials and guaranteed jobs, backed by an initial $115 million first-year investment. This is a company-reported milestone, not a verified placement count. Correction: Anchors relative timing to the source publication date and distinguishes a company announcement from verified job placements.</summary><link rel="related" href="https://reedos.dev/stack_ledger/ledger/#note-6da38e8f55121f0e70a0" /></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#astra-coding-shipping-20260621</id><title>Coding activity and shipped software are different outcomes</title><link href="https://cepr.org/voxeu/columns/writing-code-versus-shipping-code-productivity-effects-across-generations-ai-coding" /><updated>2026-09-06T12:00:00Z</updated><published>2026-06-21T12:00:00Z</published><summary>A matched event study of more than 100,000 GitHub developers estimates larger gains in commits than in software releases after AI-tool adoption. The authors identify review and integration as potential bottlenecks. These are observational estimates for the studied tools and users, not a universal productivity multiplier.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#astra-metr-uplift-20260224</id><title>METR flags limits in updated coding-productivity estimates</title><link href="https://metr.org/blog/2026-02-24-uplift-update/" /><updated>2026-09-06T12:00:00Z</updated><published>2026-02-24T12:00:00Z</published><summary>METR says selection effects and time measurement make its follow-up developer experiment an unreliable measure of current AI productivity. It considers improved speed plausible but the size uncertain. Its early-2025 slowdown finding remains a result for that earlier study, not a current universal effect.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#astra-anthropic-expertise-20260616</id><title>Agent use extends into analysis and document work</title><link href="https://www.anthropic.com/research/claude-code-expertise" /><updated>2026-09-06T12:00:00Z</updated><published>2026-06-16T12:00:00Z</published><summary>Anthropic analyzes roughly 400,000 Claude Code sessions and reports increasing use for analysis, prose and operating software. Its expertise and success measures rely on transcript classifiers and telemetry. The study supports broader-use investigation, but does not directly measure company productivity, worker earnings or net employment.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#astra-primary-care-rct-20260626</id><title>Primary-care trial separates workflow assistance from patient outcomes</title><link href="https://www.nature.com/articles/s41591-026-04503-6" /><updated>2026-09-06T12:00:00Z</updated><published>2026-06-26T12:00:00Z</published><summary>A cluster-randomized trial enrolled 9,691 patients at 16 Kenyan primary-care facilities during April–July 2025. LLM assistance did not significantly change the primary 14-day treatment-failure outcome. This study does not establish universal benefit, lack of benefit, or safety equivalence; the result applies to the studied workflow and follow-up period.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-70397d573f35452fa15e</id><title>Micron HBM4 high-volume production for NVIDIA Vera Rubin</title><link href="https://investors.micron.com/news/press-release/2026/Micron-in-High-Volume-Production-of-HBM4-Designed-for-NVIDIA-Vera-Rubin-PCIe-Gen6-SSD-and-SOCAMM2-03-16-2026/default.aspx" /><updated>2026-09-10T03:30:17Z</updated><published>2026-03-16T12:00:00Z</published><summary>Micron says it has begun volume shipment of HBM4 36GB 12H in the first quarter of calendar year 2026 and is designed for NVIDIA Vera Rubin. The company reports over 11 Gb/s pin speeds enabling bandwidth greater than 2.8 TB/s, representing a 2.3 times bandwidth and greater than 20% power efficiency improvement over its HBM3E.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-d13949dbfe3d888c1725</id><title>Fervo 3.0 well design drilling pace record at Cape Station Phase II</title><link href="https://fervoenergy.gcs-web.com/news-releases/news-release-details/fervo-energy-learning-curve-continues-3rd-generation-well-design" /><updated>2026-09-10T19:12:51Z</updated><published>2026-07-08T12:00:00Z</published><summary>Fervo says it drilled Sawtooth 7, the ninth 3.0 well at Cape Station Phase II, from spud to total depth in 21 days, reaching 19,448 feet measured depth with a 7,500-foot lateral in a 460 degrees Fahrenheit resource. The company says this sets a new company record for drilling pace on its most complex well design to date.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-9e418c7757942480b5de</id><title>S+B Gruppe secures planning permission for 12MW NIMB data center in Bucharest</title><link href="https://www.datacenterdynamics.com/en/news/sb-gruppe-to-build-data-center-in-bucharest-romania/" /><updated>2026-09-10T19:14:28Z</updated><published>2026-09-10T12:00:00Z</published><summary>S+B Gruppe has secured planning permission to build a 12MW Tier III data center named NIMB in Bucharest’s northern office district, with 36,597 square feet of white space and an expected opening in 2028.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-87533d1fd4c2bd40cd88</id><title>Sunrun Voltus residential battery capacity for AI hyperscale data centers</title><link href="https://www.datacenterknowledge.com/energy-power-supply/sunrun-voltus-bring-home-batteries-into-ai-capacity-push" /><updated>2026-09-10T19:16:56Z</updated><published>2026-08-17T12:00:00Z</published><summary>Sunrun will supply Voltus with capacity from residential solar-plus-storage systems in PJM and MISO under an agreement supporting Voltus’ Bring Your Own Capacity programs for AI hyperscale data centers, announced August 17, 2026. The companies did not disclose the capacity, number of participating homes, or specific hyperscaler projects.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-c6a710a3939e84bdf618</id><title>AMD Instinct MI355X systems now live in Saudi Arabia</title><link href="https://ir.amd.com/news-events/press-releases/detail/1298/amd-cisco-and-humain-expand-saudi-arabias-ai-infrastructure-as-amd-instinct-systems-go-live" /><updated>2026-09-10T19:44:19Z</updated><published>2026-08-31T12:00:00Z</published><summary>AMD says AMD Instinct MI355X GPU-based AI infrastructure built on Cisco Silicon One-based AI networking is now live in Saudi Arabia and serving HUMAIN customers in the Kingdom and beyond.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#policy-2026-14132</id><title>Enhanced Favorable Treatment for the United Arab Emirates Under the Export Administration Regulations</title><link href="https://www.federalregister.gov/documents/2026/07/14/2026-14132/enhanced-favorable-treatment-for-the-united-arab-emirates-under-the-export-administration" /><updated>2026-09-06T12:00:00Z</updated><published>2026-07-14T12:00:00Z</published><summary>Rule from Commerce Department, Industry and Security Bureau. Docket Docket No. 260710-0168. Published in the Federal Register 2026-07-14. https://www.federalregister.gov/documents/2026/07/14/2026-14132/enhanced-favorable-treatment-for-the-united-arab-emirates-under-the-export-administration</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-54fe2b28bbcb1d9531cd</id><title>Zankore secures $3.1bn senior term loan for AI cloud build-out</title><link href="https://www.datacenterdynamics.com/en/news/zankore-secures-31bn-senior-term-loan-facility-for-ai-cloud-buildout/" /><updated>2026-09-11T09:58:16Z</updated><published>2026-09-10T12:00:00Z</published><summary>Zankore has secured $3.1 billion in financing for the first phase of its AI cloud build-out. The joint venture targets an initial buildout of 100MW of Nvidia AI infrastructure in Indonesia, ultimately aiming to expand to 1GW.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-69812ea669e7551dc910</id><title>Nostrum Evergreen Data Center electrical authorization</title><link href="https://www.datacenterdynamics.com/en/news/nostrums-data-center-in-badajoz-gets-the-green-light-for-electrical-connection/" /><updated>2026-09-11T10:40:27Z</updated><published>2026-09-11T12:00:00Z</published><summary>Data Riocaya’s Nostrum Evergreen Data Center in Badajoz received preliminary administrative authorization for electrical infrastructure, including a 220-kV interconnection field and underground lines, with grid connection capacity up to 300MW for AI infrastructure.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-b26a7868f00c04379dde</id><title>Oracle Q1 FY2027 GPU delivery and data center capacity</title><link href="https://www.datacenterdynamics.com/en/news/oracle-delivered-300000-gpus-in-q1-fy2027/" /><updated>2026-09-11T11:03:44Z</updated><published>2026-09-11T12:00:00Z</published><summary>Oracle says it delivered more than 300,000 GPUs and 850MW of data center capacity to customers during Q1 of fiscal year 2027, revealed during the earnings call on September 10, 2026.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-81e0f363a23cb3b7b58a</id><title>Claude Opus 5 launch</title><link href="https://www.anthropic.com/news/claude-opus-5" /><updated>2026-09-12T10:36:56Z</updated><summary>Anthropic says Claude Opus 5 is available today, priced at $5 per million input tokens and $25 per million output tokens, the same as Opus 4.8.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-f415a2afda146153c4bb</id><title>Flex to acquire EPC Power for $4.4B</title><link href="https://www.datacenterknowledge.com/energy-power-supply/flex-pays-4-4b-for-epc-power-as-ai-data-centers-push-800v-architecture" /><updated>2026-09-13T10:23:45Z</updated><published>2026-09-04T12:00:00Z</published><summary>Flex says it will acquire EPC Power for $4.4 billion, adding 800V DC and grid-forming power-conversion technology to its data center infrastructure business. The deal is expected to close in the fourth quarter of 2026, subject to regulatory approvals and other closing conditions.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-803b576d5c2fff180bc2</id><title>SK hynix · HBM4</title><link href="https://news.skhynix.com/en/sk-hynix-completes-worlds-first-hbm4-development-and-readies-mass-production/" /><updated>2026-09-13T10:47:44Z</updated><published>2025-09-12T12:00:00Z</published><summary>SK hynix announced on September 12, 2025 that it has completed development and finished preparation of HBM4 mass production for the world’s first time, positioning the product as a next generation memory for ultra-high performance AI.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-73bd356d30d6d1884891</id><title>Lightmatter Passage CPO sampling with Qualcomm</title><link href="https://lightmatter.co/press-release/lightmatter-achieves-record-1-6-tbps-per-fiber-to-accelerate-ai-optical-interconnect/" /><updated>2026-09-13T10:54:31Z</updated><published>2026-03-11T12:00:00Z</published><summary>Lightmatter announced on March 11, 2026 that it successfully sampled the Passage Co-Packaged Optics chiplet with Qualcomm Technologies, demonstrating 1.6 Tbps throughput per fiber using a 16-wavelength DWDM architecture at 112G per SerDes lane. The company says the integration provides up to 8X more bandwidth per fiber than existing Near-Packaged Optics and CPO solutions and is positioned for hyperscaler deployment.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-e6c62cecca127e1a0739</id><title>Meta Kuna Data Center online</title><link href="https://datacenters.atmeta.com/2026/09/kuna-we-are-online/" /><updated>2026-09-13T11:18:34Z</updated><published>2026-09-03T12:00:00Z</published><summary>Meta says the Kuna Data Center is online and operational, part of infrastructure that helps bring its technologies and programs to life. The project broke ground in 2022 and supported 1,600 skilled trade workers at peak construction with an investment of more than $1.2 billion in Kuna.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-27b46765cd1eece38c87</id><title>AlphaGenome API preview launch</title><link href="https://deepmind.google/blog/alphagenome-ai-for-better-understanding-the-genome/" /><updated>2026-09-14T09:03:24Z</updated><published>2025-06-25T12:00:00Z</published><summary>Google DeepMind says it is introducing AlphaGenome, a new AI tool that predicts how single variants or mutations in human DNA sequences impact biological processes regulating genes, and is making it available in preview via the AlphaGenome API for non-commercial research.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-becb9044e2401cadd4ac</id><title>Grok 4.6 release announcement</title><link href="https://x.ai/news/grok-4-6" /><updated>2026-09-15T10:04:34Z</updated><published>2026-08-12T12:00:00Z</published><summary>SpaceXAI says it is releasing Grok 4.6 today, building on Grok 4.5 with a focus on long-running agents and more ambitious interactive and visual work, and that it stays with complex tasks across many steps.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-535ac8ca0a4b08064d5a</id><title>Claude in Chrome generally available</title><link href="https://claude.com/blog/claude-in-chrome-generally-available" /><updated>2026-09-15T10:12:09Z</updated><published>2026-08-26T12:00:00Z</published><summary>Anthropic says Claude in Chrome is now generally available on every paid Claude plan, with autonomous browser actions validated by a safety classifier before execution.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-9fedfe1781472eac9ddf</id><title>Grok 4.6 generally available on Amazon Bedrock</title><link href="https://x.ai/news/grok-4-6-amazon-bedrock" /><updated>2026-09-15T10:36:18Z</updated><published>2026-08-19T12:00:00Z</published><summary>xAI says Grok 4.6 is now generally available on Amazon Bedrock, offering a 500k context window and configurable reasoning efforts (low, medium, high, xhigh). Pricing is listed as $2 per 1 million tokens input, $0.50 per 1 million tokens cached input, and $6 per 1 million tokens output.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-4430077271918e3afa80</id><title>Grok 4.6 available via Gemini Enterprise Agent Platform</title><link href="https://x.ai/news/grok-4-6-vertex-ai" /><updated>2026-09-15T10:36:25Z</updated><published>2026-08-21T12:00:00Z</published><summary>xAI says Grok 4.6 is now available on Gemini Enterprise Agent Platform via Model Garden, with a 500k context window and configurable reasoning efforts (low, medium, high, xhigh). Pricing is listed as $2 per 1 million tokens input, $0.50 per 1 million tokens cached input, and $6 per 1 million tokens output.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-6dbbe9ab36c4e8153b3f</id><title>Google DeepMind releases Gemini 3.8 Live models</title><link href="https://blog.google/innovation-and-ai/technology/developers-tools/build-real-time-voice-applications-gemini-audio/" /><updated>2026-09-17T10:13:53Z</updated><published>2026-09-15T12:00:00Z</published><summary>Google DeepMind says it released new Gemini Live models in the Gemini API and Google AI Studio, including Gemini 3.8 Live and 3.8 Live Extended Thinking for real-time voice-first product experiences.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-2d963c551e983e3bcabc</id><title>IBM releases Granite 4.2 language models</title><link href="https://research.ibm.com/blog/introducing-granite-4-2" /><updated>2026-09-18T09:44:35Z</updated><published>2026-08-25T12:00:00Z</published><summary>IBM says it is releasing updated Granite 4.2 language models available in 3B, 8B, and 30B parameter sizes, purpose-built for agentic workflows with native step-by-step reasoning.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-6f9e5de84a2b02e732c6</id><title>Gemini 3.8 Live and 3.8 Live Extended Thinking launch</title><link href="https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-3-8-live-gemini-3-8-live-extended-thinking/" /><updated>2026-09-18T10:16:49Z</updated><published>2026-09-15T12:00:00Z</published><summary>Google says it is launching Gemini 3.8 Live and 3.8 Live Extended Thinking to make voice interactions more natural, fluid, and intelligent. The models handle complex reasoning, real-time visual context, and background task execution without interrupting conversation. Availability is announced for the Gemini API, Google Workspace, and the Gemini app.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-f168dcf5a39ad35f24ad</id><title>Google Labs launches CC family agent</title><link href="https://blog.google/innovation-and-ai/models-and-research/google-labs/cc-expanding-to-groups/" /><updated>2026-09-18T10:37:14Z</updated><published>2026-09-17T12:00:00Z</published><summary>Google Labs announces CC as an AI agent for families and households, with its own Google account and permissions for up to six members to share information and coordinate logistics.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-c26b30f5d0e3a135c2c0</id><title>TypeSafe AI releases Jev transformer model</title><link href="https://techcrunch.com/2026/09/18/a-new-kind-of-ai-model-from-a-chatgpt-inventor-is-thrilling-developers/" /><updated>2026-09-20T10:06:05Z</updated><published>2026-09-18T12:00:00Z</published><summary>TypeSafe AI released a new transformer-based model, Jev, that is not a large language model and produces calibrated decisions instead of text. The company says the model is cheap and fast and cannot hallucinate because users define outputs in advance.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-a4f0b8fabfbbde0f14cc</id><title>Google Research announces planetary prediction engine</title><link href="https://research.google/blog/planetary-prediction-engine-automating-global-models-via-earth-ai/" /><updated>2026-09-20T10:11:46Z</updated><published>2026-08-27T12:00:00Z</published><summary>Google Research says it introduces the planetary prediction engine, an experimental research capability within Google Earth AI that autonomously executes the full geospatial modeling workflow from data discovery to model training.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-f222be8c521b6b63ee97</id><title>OpenAI launches ChatGPT agent with own virtual computer</title><link href="https://openai.com/index/introducing-chatgpt-agent/" /><updated>2026-09-21T09:33:57Z</updated><published>2025-07-17T12:00:00Z</published><summary>OpenAI says ChatGPT now thinks and acts, proactively choosing from a toolbox of agentic skills to complete tasks for you using its own computer. The launch post is dated July 17, 2025 and describes a unified agentic system combining Operator website interaction, deep research synthesis and ChatGPT conversational fluency.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#policy-2025-00636</id><title>BIS Framework for Artificial Intelligence Diffusion (advanced computing + model weights)</title><link href="https://www.federalregister.gov/documents/2025/01/15/2025-00636/framework-for-artificial-intelligence-diffusion" /><updated>2026-09-06T12:00:00Z</updated><published>2025-01-15T12:00:00Z</published><summary>Interim final rule (Doc. 2025-00636, Docket 250107-0007, 90 FR 4544) expands worldwide licensing for advanced computing ICs (ECCNs 3A090.a / 4A090.a and related .z items), adds ECCN 4E091 controls on certain closed-weight AI model weights trained above 10^26 operations, and creates license exceptions and Data Center VEU pathways. Effective 2025-01-13; general compliance 2025-05-15. Grade A government action only—no shipment volumes inferred.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#policy-2024-28270</id><title>BIS IFR: FDP additions and advanced computing / semiconductor manufacturing control refinements</title><link href="https://www.federalregister.gov/documents/2024/12/05/2024-28270/foreign-produced-direct-product-rule-additions-and-refinements-to-controls-for-advanced-computing" /><updated>2026-09-06T12:00:00Z</updated><published>2024-12-05T12:00:00Z</published><summary>Interim final rule (Doc. 2024-28270) adds foreign-produced direct product rule coverage and refines controls on advanced computing and semiconductor manufacturing items (including HBM-related and SME pathways). Effective 2024-12-02 with staggered compliance. Grade A government action only—no chip shipment volumes inferred.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#policy-2026-00789</id><title>BIS final rule: license review policy for certain advanced computing commodities</title><link href="https://www.federalregister.gov/documents/2026/01/15/2026-00789/revision-to-license-review-policy-for-advanced-computing-commodities" /><updated>2026-09-06T12:00:00Z</updated><published>2026-01-15T12:00:00Z</published><summary>Final rule (Doc. 2026-00789) revises license review policy for certain advanced computing exports (e.g. case-by-case treatment under certifications for specified TPP and DRAM bandwidth thresholds to China/Macau). Effective 2026-01-15. Grade A government action only—no shipment volumes inferred.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#pjm-2026-ltf-large-load-firm-nonfirm</id><title>PJM 2026 LTF: firm vs non-firm large-load derate language</title><link href="https://www.pjm.com/-/media/DotCom/library/reports-notices/load-forecast/2026-load-report.pdf" /><updated>2026-09-06T12:00:00Z</updated><published>2026-01-14T12:00:00Z</published><summary>The 2026 PJM Load Forecast Report discusses firm versus non-firm treatment and derate language for large-load additions. No single data-center GW total is taken from this LTF narrative; LAS ~30 GW planning figure remains on pjm-datacenter-growth-2025-2030-gw. Grade A operator disclosure—no invented energized MW.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#policy-2025-17893</id><title>BIS Entity List additions and revisions (Doc. 2025-17893)</title><link href="https://www.federalregister.gov/documents/2025/09/16/2025-17893/additions-and-revisions-to-the-entity-list" /><updated>2026-09-06T12:00:00Z</updated><published>2025-09-16T12:00:00Z</published><summary>Final rule (Doc. 2025-17893, 90 FR 44496) adds 32 entities to the Entity List (China 23, Turkey 3, UAE 2, and others), revises one Russia address entry, and corrects typographical errors in 27 listings. Grade A government action only—no chip shipment volumes inferred.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#policy-2025-19001</id><title>BIS Affiliates rule: 50% ownership Entity List expansion</title><link href="https://www.federalregister.gov/documents/2025/09/30/2025-19001/expansion-of-end-user-controls-to-cover-affiliates-of-certain-listed-entities" /><updated>2026-09-06T12:00:00Z</updated><published>2025-09-30T12:00:00Z</published><summary>Interim final rule (Doc. 2025-19001) extends Entity List, MEU List, and certain SDN-linked EAR restrictions to foreign affiliates owned 50% or more by listed parties (Affiliates rule), with Temporary General License and Red Flag 29. Grade A government action only—no tonnage.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#policy-2025-19508</id><title>BIS Entity List additions (Doc. 2025-19508)</title><link href="https://www.federalregister.gov/documents/2025/10/09/2025-19508/additions-to-the-entity-list" /><updated>2026-09-06T12:00:00Z</updated><published>2025-10-09T12:00:00Z</published><summary>Final rule (Doc. 2025-19508, 90 FR 48193) adds 29 entries (26 entities and 3 addresses) under China, Turkey, and the UAE. Grade A government action only—no chip shipment volumes inferred.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#policy-2025-19846</id><title>BIS one-year suspension of Affiliates rule expansion</title><link href="https://www.federalregister.gov/documents/2025/11/12/2025-19846/one-year-suspension-of-expansion-of-end-user-controls-for-affiliates-of-certain-listed-entities" /><updated>2026-09-06T12:00:00Z</updated><published>2025-11-12T12:00:00Z</published><summary>Final rule (Doc. 2025-19846, 90 FR 50857) imposes a one-year suspension of the Affiliates rule (through 2026-11-09) before scheduled reinstatement. Grade A government action only—no tonnage.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#policy-2025-19858</id><title>BIS Entity List revisions (Arrow China removal)</title><link href="https://www.federalregister.gov/documents/2025/11/12/2025-19858/revisions-to-the-entity-list" /><updated>2026-09-06T12:00:00Z</updated><published>2025-11-12T12:00:00Z</published><summary>Final rule (Doc. 2025-19858, 90 FR 50858) removes Arrow China Electronics Trading Co., Ltd. and six aliases under Arrow Electronics (Hong Kong) Co., Ltd. Grade A government action only—no tonnage.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#policy-2026-17230</id><title>BIS Entity List removal (Doc. 2026-17230)</title><link href="https://www.federalregister.gov/documents/2026/08/24/2026-17230/removal-from-the-entity-list" /><updated>2026-09-06T12:00:00Z</updated><published>2026-08-24T12:00:00Z</published><summary>Final rule (Doc. 2026-17230, 91 FR 54657) removes one Turkey-destination entity from the Entity List. Grade A government action only—no chip shipment volumes inferred.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#policy-2026-17231</id><title>BIS Entity List revisions (Doc. 2026-17231)</title><link href="https://www.federalregister.gov/documents/2026/08/24/2026-17231/revisions-to-the-entity-list" /><updated>2026-09-06T12:00:00Z</updated><published>2026-08-24T12:00:00Z</published><summary>Final rule (Doc. 2026-17231) removes two Hong Kong addresses associated with Arrow Electronics (Hong Kong) Co., Ltd. from the Entity List under China. Grade A government action only—no tonnage.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#wh-eo-14318-dc-permitting-2025-07-23</id><title>EO: Accelerating Federal Permitting of Data Center Infrastructure</title><link href="https://www.whitehouse.gov/presidential-actions/2025/07/accelerating-federal-permitting-of-data-center-infrastructure/" /><updated>2026-09-06T12:00:00Z</updated><published>2025-07-23T12:00:00Z</published><summary>Presidential action (2025-07-23) directs agencies to accelerate federal permitting for data-center and related energy/component infrastructure. Defines a Data Center Project as a facility requiring greater than 100 MW of new load dedicated to AI inference, training, simulation, or synthetic data generation. Grade A government action—no MW build totals inferred.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#apps-jagged-frontier-orgsci-2026</id><title>Dell'Acqua et al.: jagged technological frontier RCT</title><link href="https://doi.org/10.1287/orsc.2025.21838" /><updated>2026-09-06T12:00:00Z</updated><published>2026-03-11T12:00:00Z</published><summary>Organization Science field experiment (758 BCG knowledge workers; DOI 10.1287/orsc.2025.21838): within-frontier tasks +12.2% tasks completed and +25.1% faster with GPT-4 access; outside-frontier complex managerial task −19% correct solutions. Independent research (grade B)—method-first, not a seat-count or universal ROI.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-be027e747dc62274e99f</id><title>SpaceXAI announces Grok 4.7 model launch</title><link href="https://x.ai/news/grok-4-7" /><updated>2026-09-22T11:37:55Z</updated><published>2026-09-21T12:00:00Z</published><summary>SpaceXAI says Grok 4.7 is its most capable model for coding and knowledge work, served at the same price and speed as Grok 4.6, with a new larger base model and longer reinforcement learning run.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-313e0b7ce812a8a8da49</id><title>Ayar Labs and Wiwynn announce partnership for optically connected rack-scale AI systems</title><link href="https://ayarlabs.com/news/ayar-labs-and-wiwynn-partner-to-bring-co-packaged-optics-to-rack-scale-ai-systems/" /><updated>2026-09-23T09:36:13Z</updated><published>2026-03-11T12:00:00Z</published><summary>Ayar Labs and Wiwynn announced a strategic partnership on March 11, 2026 to deliver optically connected, rack-scale AI systems for next-generation hyperscale AI workloads, integrating Ayar Labs’ CPO technology with Wiwynn’s rack-level design and manufacturing.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#note-a0028f8ac1f201213dc3</id><title>Gemini 3.8 Flash TTS and Gemini 3.8 Flash-Lite TTS launch</title><link href="https://blog.google/innovation-and-ai/models-and-research/gemini-models/gemini-3-8-text-to-speech/" /><updated>2026-09-24T09:01:41Z</updated><published>2026-09-23T12:00:00Z</published><summary>Google announces Gemini 3.8 Flash TTS and Gemini 3.8 Flash-Lite TTS as new text-to-speech models, rolling out starting today for developers in the Gemini API and Google AI Studio, with enterprise and consumer availability noted as coming soon or in Gemini Notebook and Google Vids.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T122702Z-190f0bb651e94fdc9f00d06761d75b98</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:27:09Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T122912Z-9afc00a192064b9bb940c6552de66336</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:29:42Z</updated><summary>Fetched 5 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T123148Z-daa465d5deca4e2a9010b62abfd1fa4d</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:31:53Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T123358Z-b8bc0e0153bf4de7b6c43979f2bbde1a</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:34:08Z</updated><summary>Fetched 1 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T123613Z-96213579513c4d1db9c1f444ec45b702</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:36:16Z</updated><summary>Fetched 2 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T123823Z-66ae54a96c5c46e4b7a284986bad1d1d</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:38:33Z</updated><summary>Fetched 2 documents; accepted 0 records; quarantined 0 proposals. 1 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T124038Z-f6cce05d6c8d48cd93e3cca6206f32fe</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:40:47Z</updated><summary>Fetched 1 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T124254Z-bb98b6bf4b344534807449b0218c1e75</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:43:03Z</updated><summary>Fetched 1 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T124509Z-4b69398eba4c46b881f8504a43867174</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:45:18Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T124724Z-dd48a3f7f04f441fb9374ef9d8683f89</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:47:33Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T124939Z-dbe20130ea3042f9b436aff1753d4d25</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:49:55Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T125159Z-193ceaf05fe64043a975c492da082c4d</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:52:08Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T125410Z-ed150b59c43f4f3d81e029769362dbd3</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:54:31Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T125635Z-929616f3f7eb43eabf33392b338df3d4</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:56:46Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T125710Z-65f6ecb7609446c7a809f90ce11e8e6c</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:57:14Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T125920Z-892a804ee7a24226949b764ca6326041</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T12:59:29Z</updated><summary>Fetched 2 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T130136Z-97a660e7d48846d7ab0356e50d6a2296</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:02:13Z</updated><summary>Fetched 5 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T130236Z-e6478d77622c4ff7879854ee1d0bd98a</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:02:40Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T130446Z-e139750d65144006b4d4b6452f3a6103</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:05:15Z</updated><summary>Fetched 1 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T130721Z-a257c94855d44b5ab27a44f55e1d2967</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:07:27Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T130931Z-14f3f549191847ce9d7f8e7c19b336b9</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:09:40Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T131147Z-63a54077661f41b7b03667f6ba3669e9</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:11:55Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T131357Z-7e0519c64b05402d9d10d3e29648639c</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:14:03Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T131607Z-72197e9e6eec43509e7379a9ab99b97e</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:16:16Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T131822Z-da7474de41f5436dbcaff7958a9e1c16</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:18:33Z</updated><summary>Fetched 1 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T132037Z-8029ea25c6c940d2aa11deb5d7a9808c</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:20:50Z</updated><summary>Fetched 2 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T132253Z-14b632f2c68e4737b5e73af9af7946b4</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:23:00Z</updated><summary>Fetched 2 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T132503Z-4cd80efcb71d4ad0a2c75da61e5d51fe</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:25:13Z</updated><summary>Fetched 0 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T132718Z-8d1745595dab4ac6a866a4ab018e8d1d</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:27:26Z</updated><summary>Fetched 1 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry><entry><id>https://reedos.dev/stack_ledger/ledger/#run-20260927T132933Z-dc054c169b8948be88401754f7aa685e</id><title>Research run: partial · 0 new research records</title><link href="https://reedos.dev/stack_ledger/ledger/" /><updated>2026-09-27T13:29:43Z</updated><summary>Fetched 3 documents; accepted 0 records; quarantined 0 proposals. 0 source failures.</summary></entry></feed>