The long-haul fiber tier linking whole campuses hundreds of kilometers apart over coherent DWDM optics. Light in fiber still needs about 5 milliseconds to cross 1,000 km, so only loosely synced training crosses this tier; interactive traffic mostly does not.
The optical fabric outside a rack or server: one port per GPU into a leaf-and-spine network that lets any GPU on the campus reach any other. It carries far less traffic per link than scale-up, which is why it can afford to be fiber instead of copper.
The network tier that joins a small group of accelerators tightly enough to split one model layer's own math across them. Here it is NVLink inside an NVL72 rack or a single DGX H100 server, on copper. Other chips use their own: ICI inside a 64-chip Google TPU cube, whose cubes are joined by optical circuit switches; NeuronLink across a 64-chip AWS Trainium2 UltraServer; and UALink, an open standard for the same job.
SerDes
also serializer/deserializerdata
Circuits along a die's edge that turn parallel on-chip data into the fast serial lanes a link like NVLink sends off the package. Every high-speed interconnect on this page, copper or optical, starts and ends at a SerDes.
Fiber with a core narrow enough that light travels one path through it, avoiding the mode-mixing that limits shorter-reach multimode fiber. It is what carries scale-out, campus, and long-haul optics on this page, since only single-mode fiber reaches past a few hundred meters.
Solid-state transformer (SST)
also SSTpower
Power electronics switching at high frequency that replace the 60 Hz transformer, the UPS, and the rack rectifiers with a single conversion from 34.5 kV AC straight to 800 V DC. Navitas and NVIDIA both describe this step as eliminating conversion stages to cut losses, but neither publishes a single efficiency figure for it; this page's better-than-98% figure is its own assumption, informed by that direction, for hardware that is not yet shipping.
- Navitas Semiconductor: 'Navitas Supports 800 VDC Power Architecture...' (10/13/2025): describes the architecture as eliminating 'multiple traditional AC/DC and DC/DC conversion stages, maximizing energy efficiency, reducing losses' without stating a percentage for this specific conversion
- NVIDIA: Key benefits section: 'Improves end-to-end efficiency by up to 5% compared to current 54 V systems' — a whole-chain figure, not a single-stage SST number
SpaceXAI Colossus 1
also Colossus, xAI Colossus 1general
The first Memphis campus of SpaceXAI (xAI until its July 2026 rebrand, after SpaceX acquired it in February): fully built and operating. About 200,000 GPUs (H100, H200, some GB200), leased in full to Anthropic since 05/06/2026; confirmed grid supply is 150 MW from MLGW/TVA. Trade reports counted about 35 on-site gas turbines, about 422 MW in all; SpaceXAI says its remaining temporary turbines must all be removed by July 2027, and that more than 240 batteries let the site come fully off the grid in emergencies or at peak demand.
- Compute Atlas: 'About 35 on-site natural-gas turbines (a combined 422 MW per SELC and aerial imagery) supplement a 150 MW grid substation and Tesla Megapack storage'; ~100,000 H100 GPUs Phase 1, later expanded with H200s
- Data Center Dynamics: reports TVA/MLGW's board approving 'an additional 150MW of power' for Colossus
- SpaceXAI (SpaceX): Power tab: 'more than 240 batteries so Colossus I can come completely offline during emergencies or peak demand'; Air tab: 'all remaining temporary turbines must be removed by July 2027'
- Business Insider, via Yahoo Finance: reports xAI's rebrand to SpaceXAI, 07/06/2026
SpaceXAI Colossus 2
also xAI Colossus 2general
SpaceXAI's second Memphis campus (xAI until July 2026), about 3 km from Colossus 1: live and still growing, and called the "First Gigawatt Datacenter" by SemiAnalysis in 09/2025. By satellite estimate it ran about 946 MW of IT power and 440,000 Nvidia chips as of 09/24/2026; a day later Elon Musk put it at 550,000 GPUs, 110k GB200 and 440k GB300, with another 220k GB300 due the following week, 220k in November and, "if we get lucky", 220k more by late December. SpaceXAI says it plans 1M+ GPUs. It lists a planned 3.3 GWh grid-connected battery pack for it (its energy developer Riley Trettel told the TVA board so on 08/20/2026), says its temporary gas turbines must be removed by July 2027, mentions no diesel generators, and says it uses closed-loop cooling that takes only domestic water. By Epoch AI's tracking, it is the most powerful AI data center operating today, by both IT power and compute; Amazon and Anthropic's New Carlisle campus is next, at about 910 MW with more chips but less compute.
- Epoch AI: directory entry, updated 09/24/2026: '1,112k H100-eq AI compute, supported by 946 MW of IT power,' with '110k' B200 and '330k' B300 chips (≈440k total)
- Epoch AI: 'Colossus 2 is the largest tracked AI data center at about 946 MW of current IT power, followed by Anthropic-Amazon New Carlisle at about 910 MW'
- SemiAnalysis: headline: 'xAI's Colossus 2 — First Gigawatt Datacenter In The World'
- SpaceXAI (SpaceX): Colossus II tab: 'GPUs planned 1M+'; 'America's largest grid-connected battery pack will provide 3.3 gigawatt hours'. Water tab: 'Colossus II uses closed-loop cooling and takes only domestic water'. Air tab: 'all remaining temporary turbines must be removed by July 2027'. No tab mentions diesel generators (checked 09/27/2026)
The switch tier above the leaves that connects every leaf to every other, so any GPU on the campus can reach any other in a couple of hops. Two tiers of 144-port switches reach roughly 10,000 GPUs before a third tier or parallel fabric planes are needed.
Stargate Abilene
also OpenAI Stargate Abilenegeneral
OpenAI, Oracle, Crusoe, and SoftBank's Texas campus: partly operating, partly still being built. Buildings 1-4 of 8 were live at about 421 MW of IT power as of 09/24/2026; buildings 5-8 are roofed and being fitted out, with the full campus, over 1 GW, due between Q4 2026 and Q1 2027.
- Epoch AI: directory entry, updated 09/24/2026: '421 MW of IT power'; buildings 5-8 'structurally complete and roofed but not yet confirmed operational'
- Epoch AI: 'Projected capacity: 1.2 GW | 1.0 million H100-equivalents...Projected completion: Q4 2026' for the full site
Substation
also campus substationpower
Where the transmission line dead-ends on steel gantries and lands on a ring of SF6 circuit breakers and disconnect switches, with instrument transformers to measure the power and surge arresters to clip lightning. Building one, with its interconnection study, commonly takes two to four years — see Interconnection.
SuperNIC
also ConnectX SuperNICdata
NVIDIA's per-GPU network card for scale-out traffic, letting a GPU reach other racks without going through its CPU. GB300 pairs each GPU with a ConnectX-8 SuperNIC running 800 Gb/s.
- NVIDIA: Specifications, C8180 single-port variant: InfiniBand speed 'XDR/NDR/HDR/HDR100/EDR/SDR' — XDR is NVIDIA's 800 Gb/s InfiniBand generation (see nvidia-xdr-switch-specs)
A lineup of drawout breakers that protects every outgoing circuit in a room and switches it automatically between utility and generator power when the grid drops. A campus has 34.5 kV switchgear feeding the halls, and each hall has its own 480 V (or medium-voltage, in a DC design) switchgear inside.